Section 33Governance and Roadmap

Requirement maintenance rules

Defines how requirements are identified, changed, split, prioritized, traced, and kept consistent over time.

Section relationships
  • A requirement may be added, changed, split, or removed only with a recorded rationale.
  • An implementation detail SHALL not be promoted to a product requirement solely because a prototype used it.
  • A requirement with two independently falsifiable obligations SHALL be split.
  • A quantitative requirement SHALL name its workload, machine, procedure, and statistic.
  • A validation or accuracy requirement SHALL name the observable, conditions, evidence source and class, dataset or reference case, comparison procedure, and error measure or pass criterion.
  • A requirement SHALL not claim support merely because an underlying dependency advertises a related feature.
  • A deferred requirement SHALL retain its intended boundary so the MVP does not make it unnecessarily impossible later.

Generated from the canonical specification. Edit section metadata or prose in docs/requirements.md; the website rebuilds this page and its relationships automatically.